• head_banner_02

Factory Price Fixtures Tools - Progressive – Meiln

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Assume full responsibility to meet all demands of our clients; achieve continuous advancements by promoting the growth of our clients; become the final permanent cooperative partner of clients and maximize the interests of clients for Stamping Steel Parts, Metal Work Measuring Tools, Stamping Tool Kit, Top quality, timely company and Aggressive cost, all win us a superior fame in xxx field despite the international intense competition.
Factory Price Fixtures Tools - Progressive – Meiln Detail:

Tool type: Transfer tool
Process: 1500T x 6 stages
Tool Size:  1715mm x 775mm x 900mm
Tool Weight:  Total Weight 21098kg
Tool Material Grade: Upper and Lower die shoe & blank holder: S50C
Forming plate, trim punch & cutting edge: SKD11 HRC58-60
Stripper plate insert, some forming block: HMD-5
Steel Treatment: Forming Draw Block: TD+Chroming
Upper Die: FCD550+Chroming
Standard Components: Main standard part are sourced from MISUMI, gas spring are .
Stamping part material: CR210BH-GI50/50-U
SPM: 30
Cavity: R and L two part out
Complexity: Middle
◆Application: The tool applicated to automotive stamping part mass production.
Press Machine: 2000T hydraulic press, 1200T Mechanical
Lead Time: 6 months
Background:
As we all known that gripper interference to transfer tool is a common issue, our designers will dynamically simulate for transfer tools after die design finished in order to avoid tool interference, shorten further tool maintenance and improve work efficiency. Besides, after tool is made, we will run real object simulation for gripper to pick up and transfer parts, by this way then check if any interference problem with transfer tool.

Advantage:
Professional Service: professional team to support our oversea customers, from stamping dies design review, timing report, buy off to home line tryout.
Faster Lead time: 16-17 weeks to provide the tool cut samples for transfer dies, 20-21 weeks to provide the 100% qualified samples to our customers.
Best Price for Progression tool, transfer tool and checking fixture.

If you are interested in transfer tool or have any other questions, please don’t hesitate to contact me, and we will be pleased to reply you.


Product detail pictures:

Factory Price Fixtures Tools - Progressive – Meiln detail pictures

Factory Price Fixtures Tools - Progressive – Meiln detail pictures

Factory Price Fixtures Tools - Progressive – Meiln detail pictures

Factory Price Fixtures Tools - Progressive – Meiln detail pictures

Factory Price Fixtures Tools - Progressive – Meiln detail pictures

Factory Price Fixtures Tools - Progressive – Meiln detail pictures

Factory Price Fixtures Tools - Progressive – Meiln detail pictures

Factory Price Fixtures Tools - Progressive – Meiln detail pictures


Related Product Guide:

"Based on domestic market and expand abroad business" is our enhancement strategy for Factory Price Fixtures Tools - Progressive – Meiln , The product will supply to all over the world, such as: Japan, moldova, kazakhstan, Our product quality is one of the major concerns and has been produced to meet the customer's standards. "Customer services and relationship" is another important area which we understand good communication and relationships with our customers is the most significant power to run it as a long term business.
  • This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By Freda from Poland - 2017.11.29 11:09
    Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Jocelyn from Moscow - 2017.04.18 16:45
    Write your message here and send it to us